All formats and designs are approved by building authorities and are also suitable for structures with high static requirements. The low panel thickness and low weight reduce the load on the structure without compromising stability or resistance.
KerAion® facade panels are fastened to the substructure using K8 stainless steel clips. The clip lips are color-matched to the panel design. To prevent rattling and excessive stress from changing wind loads, the facade panels are softly mounted on the substructure using foam stampings or, alternatively, polyurethane.
Article 545
Double clamp K8
Weight: 20 kg/1,000 pieces
Perforation: 4 x 3.3 mm Ø
Base plate: black
coated, lips: coated
similar to plate color
Material: 1.4571
Article 546
Edge clamp K8
Weight: 20 kg/1,000 pieces
Perforation: 4 x 3.3 mm Ø
Base plate: black
coated, lips: coated
similar to plate color
Material: 1.4571
Article 547
Edge clamp K8, left
Weight: 20 kg/1,000 pieces
Perforation: 4 x 3.3 mm Ø
Base plate: black
coated, lips: coated
similar to plate color
Material: 1.4571
Article 548
Edge clamp K8, right
Weight: 20 kg/1,000 pieces
Perforation: 4 x 3.3 mm Ø
Base plate: black
coated, lips: coated
similar to plate color
Material: 1.4571
Article 549
Single clamp K8
Weight: 20 kg/1,000 pieces
Perforation: 4 x 3.3 mm Ø
Base plate: black
coated, lips: coated
similar to plate color
Material: 1.4571
Item 675
Stainless steel blind rivets, black
Weight: 1.05 kg/box
Nominal dimensions: 3.2 x 9.5 mm
Box contents: 500 pieces
Extended mandrel (58 mm)
Item 347-01
Foam die-cut part*
Weight: 1.80 kg/roll
Nominal dimensions: 20 x 30 x 8 mm
Roll: 1380 pieces/roll
Self-adhesive
Item 506
Joint tape, black
Weight: 0.5 kg/roll
Nominal dimensions: 40 mm wide, 50 m
Self-adhesive, weather-resistant
* Alternatively, soft mounting of the plates is also possible with PUR or MSPolymer adhesives.
Please note: The use of silicone rubbers should generally be avoided, as silicone oils migrate and create sticky, dirt-binding surfaces. Therefore, please use only the recommended system components (foam stamped parts) or consult with us before processing the planned products. The usual final cleaning of the building is still required.
The substructure must be installed in accordance with a project-specific structural analysis. The general building authority approval Z-10.3-776 serves as the basis for this.